Built for every stage of construction.

ONE TIME Cement Add can be used across waterproofing, plaster and concrete applications. Follow the recommended material quantities and application process for the work being carried out.

APPLICATION 01

Waterproofing

Create a brush-applied cement coating for waterproofing surfaces and areas exposed to moisture.

WATERPROOFING APPLICATION
Materials Required
  • 1 Mug ONE TIME Cement Add
  • ½ Mug Water
  • 2 Mugs Cement
  • Brush
Mixing Ratio
2 Cement : 1 Additive : ½ Water
Best Used For
Terrace Bathroom Water Tank Exterior Walls
01

Surface Preparation

Clean the surface thoroughly. Remove dust, dirt, loose particles, oil and old damaged material. The surface should be reasonably clean and sound before application.

02

Prepare Mixture

Take 2 mugs of cement, 1 mug of ONE TIME Cement Add and ½ mug of water. Mix properly until the mixture becomes smooth and uniform.

03

Mix Well

Continue mixing until there are no lumps and the mixture reaches a brushable coating consistency.

04

Apply First Coat

Apply the mixture evenly using a brush. Cover the complete surface and pay special attention to corners, joints, cracks and leakage-prone areas.

05

Additional Coat if Required

Allow the first coat to set before applying another coat. Additional coating can be used for better coverage according to the product and application requirement.

APPLICATION 02

Plaster

Use ONE TIME Cement Add in plaster applications for internal, external, repair and wall levelling work.

PLASTER APPLICATION
Materials Required
  • 250 ml ONE TIME Cement Add
  • 1 Bag Cement
  • Water as Required
Recommended Quantity
250 ml Additive / 1 Bag Cement
Suitable For
Internal Plaster External Plaster Repair Work Wall Levelling
01

Prepare Surface

Remove loose plaster, dust, dirt and weak material from the wall. Clean the surface thoroughly and repair major cracks or damaged areas if necessary.

02

Measure Additive

Measure 250 ml of ONE TIME Cement Add for every 1 bag of cement.

03

Prepare Cement Mixture

Mix cement with the other plaster materials according to the normal plaster mix or specified mix design. Add the measured ONE TIME Cement Add.

04

Add Water Gradually

Add water gradually as required until the mixture reaches a workable consistency suitable for plaster application.

05

Apply Plaster

Apply the plaster evenly over the prepared surface. Maintain the required thickness and ensure proper levelling.

06

Finish & Cure

Finish the surface properly and follow appropriate curing practices to support the desired performance of the plaster.

APPLICATION 03

Concrete

Add ONE TIME Cement Add to concrete mixes used for slabs, beams, columns, foundations and RCC work.

CONCRETE APPLICATION
Materials Required
  • 100 ml ONE TIME Cement Add
  • 1 Bag Cement
  • Sand & Aggregate
  • Water as per Mix Design
Recommended Quantity
100 ml Additive / 1 Bag Cement
Suitable For
Slab Beam Column Foundation RCC Work
01

Prepare Materials

Keep cement, sand, aggregate, water and ONE TIME Cement Add ready before starting the concrete mixing process.

02

Measure Additive

Measure 100 ml of ONE TIME Cement Add for every 1 bag of cement.

03

Prepare Concrete Mix

Prepare cement, sand and aggregate according to the required concrete mix design. Add 100 ml of ONE TIME Cement Add.

04

Add Water Carefully

Add water according to the concrete mix design. Avoid excess water because it can affect the required concrete performance.

05

Mix Thoroughly

Mix the concrete thoroughly so the additive is distributed evenly throughout the mixture.

06

Place Concrete

Place the prepared concrete for slabs, beams, columns, foundations or other RCC applications as required.

07

Compact & Finish

Properly compact the concrete to help remove air voids and finish the surface according to the construction requirement.

08

Proper Curing

Follow standard curing practices appropriate for the concrete work to support strength and durability.

QUICK REFERENCE

One product.
Different quantities.

Use the appropriate quantity of ONE TIME Cement Add according to the application.

Waterproofing

1 Mug ONE TIME Cement Add + 2 Mugs Cement + ½ Mug Water

Plaster

250 ml ONE TIME Cement Add for 1 Bag Cement

Concrete

100 ml ONE TIME Cement Add for 1 Bag Cement